Installation Guide HR-01
Installation for 775 / AM2 / 478 / K8
 
- DETAILS -

Detail drawing
775 Installation
AM2 Installation

K8 Installation
478 Installation
Disclaimer:
Thermalright or its owners or partners is not responsible for damage or loss of any kind that may occur as a result of using or misusing this or any product we manufacture. Use common sense and review all product details prior to use. Ask a question


775 Installation
- STEP 1-
- STEP 2-
Parts for the HR-01( Intel 775) heatsink.
Apply a thin layer of thermal paste on to bottom of the heatsink base.

- STEP 3 -
- STEP 4 -
With the thermal paste properly applied, place the heatsink on top of the CPU.
Push down the fastener until you hear a click. Do the same for the other three.

- STEP 5 -
HR-01 (Intel 775) installed.


AM2 Installation
- STEP 1-
- STEP 2-
Stock AM2 Socket RM.
Remove/uninstall the 4 screws.

- STEP 3 -
- STEP 4 -
Replace stock RM with AM2-RM (Rev. A).
Tighten the four screws.

- STEP 5-
- STEP 6-
Slide S-Clip through HR-01.
Place the center pillar on the clip to the socket.

- STEP 7-
- STEP 8-
To rotate 90 degrees, tilt the S-Clip at an angle and turn.
Rotate the heatsink until it is facing the system exhaust fan.

- STEP 9 -
- STEP 10 -
Hook the two ends of the clip on each end of RM
Push in the lock handle to secure in place.

- STEP 11 -
Installation complete.


478 Installation
- STEP 1-
- STEP 2-
Parts for the HR-01 (Intel P4-478) heatsink.
Apply a thin layer of thermal paste on to bottom of the heatsink base.

- STEP 3 -
- STEP 4 -
Apply a thin layer of thermal paste on top of the CPU DIE.
Screw in the M shaped heatsink clip onto the retention bracket.

- STEP 5-
- STEP 6-
Insert the M shaped heatsink clips and the retention bracket through the heatpipes.
Align the dome on the retention bracket to the socket on the top of the heatsink.

- STEP 7-
- STEP 8-
Slightly adjust the retention plate with the M shaped heatsink clips attached to ensure proper placement with heatsink.
Hook the heatsink clips into RM.

- STEP 9 -
HR-01(Intel P4) installed.


K8 Installation
- STEP 1-
- STEP 2-
HR-01-K8 and its included parts
A K8 motherboard

- STEP 3 -
- STEP 4 -
Apply thermal paste to CPU and bottom of HR-01 heatsink.
Slide the S-type clip through the heatsink, between the heatpipes.

- STEP 5-
- STEP 6-
Stick the pillar on the S-type clip into the socket on top of the heatsink base.
With the pillar stationed in the socket, rotate the S-Clip 90 degrees.

- STEP 7-
- STEP 8 -
Hook one end of the clip on to the lug on the RM and then the other end on the lug on the other side of the RM
And then push that end of the clip inward.

- STEP 9 -

- STEP 10 -

Turn the lock handle to lock in place.
Installation of the S-type clip complete.


Type 2 Installation Follow Step 1~4 of Type 1 Installation
- STEP 5 -

- STEP 6 -

Stick the pillar on the S-type clip into the socket on top of the heatsink's base and then turn the clip 90 degrees.
Hook one end of the S-type clip's slot into the center lug of the K8 retention mount and then the other end.

- STEP 7 -

- STEP 8 -

Press down on the lever to secure the heatsink.
Turn the lock handle to lock in place.

- STEP 9 -

- STEP 10 -

Turn the lock handle to lock in place.
PS-type clip installation complete.
 
Copyright c 2003 Thermalright Inc. All rights reserved.