Installation Guide HR-11
Installation
 
- DETAILS -

Detail drawing
DHR-11 + VGA Stock Cooler Installation
HR-11 + V2 VGA Cooler Installation
HR-11 + HR-03 Rev. A Installation

Disclaimer:
Thermalright or its owners or partners is not responsible for damage or loss of any kind that may occur as a result of using or misusing this or any product we manufacture. Use common sense and review all product details prior to use. Ask a question


HR-11 + VGA Stock Cooler Installation
- STEP 1-
- STEP 2-
Use thinner screws if installing HR-11 with stock cooling. Use thicker screws if with V2. No screws are needed if for HR-03 series.
Before installation, peel off protective film.

- STEP 3 -
- STEP 4 -
Remove stock cooler¡¦s screws.
Install HR-11 in an angle to best fit your system configuration.

- STEP 5 -
After choosing the best position, tighten screws to secure in place.


V2+HR-11 Installation
- STEP 1-
- STEP 2-
Apply thin layer of thermal paste to heatsink base and GPU. Then place the heatsink on top of GPU and line up with GPU mounting holes.
After choosing the best position for your HR-11, tighten screws to secure HR-11 and V2 in place.

- STEP 3-
Installation of V2 and HR-11 complete.


HR-03 Rev.A + HR-11 Installation
- STEP 1-
- STEP 2-
To install HR-11 with HR-03, Installation Type 2 of HR-03 must be used. Installation of HR-11 begins when Step 1 to Step 6 of HR-03 are followed.
Have the HR-11 base inserted through the screws and then apply the spacer/washer supplied from

- STEP 3 -
- STEP 4 -
Apply the nuts/screw caps to complete the installation.
Installation of HR-03 and HR-11 complete.